DOWNLOADS
Availability Q4 2022
Availability Q4 2022


14.627 m2

9.441 m2

2.281 m2

BREEAM Very Good

Q4 2022

1-4

Last Mile
11 METERS
minimun clear height
31,5 METERS
manouvering yard
4
access ramps
16
loading docks
PV INSTALLATION
in the rooftop
ROOF VENTS
with wind and rain sensors
MEDIUM RISK 5 TYPE B
FP System in line with regulations
DEAD LOADS OF 5T/m2 AND OCCASIONAL LOADS OF 6T/m2
concrete slabs
FULLY EQUIPPED OFFICES
with A/C hot-cold, false ceilings, raised access floors and toilets
11 METERS
Minimum Clear Height
MEDIUM RISK 5 TYPE B
FP System in line with regulations
FULLY EQUIPPED OFFICES
with A/C hot-cold, false cellings,
raised access floors and toilets
PV INSTALLATION
in rooftop
16
loading docks
DEAD LOADS OF 5T/m2 AND OCCASIONAL LOADS OF 6T/m2
Concrete slab
31,5 METERS
manouvering yard
4
access ramps
ROOF VENTS
with wind and rain sensors
Last Mile Logistics within Madrid´s 1st ring offering flexible warehouse space.
State-of-the-art logistics development located in Villaverde, a prime logistics location within Madrid’s first ring.
Located just 11 km from Madrid with access to the entire city within a 20-minute drive time, Villaverde is a sought-after location for last mile e-commerce and distribution operators.
Direct access via key highways including the A-42, M-40, M-45/A-4 and Av. de Andalucía.
25 minutes from the airport, 600m from Villaverde Alto metro & train station and 150m from bus stops with direct lines to Madrid.

To contact us, please fill in the form below or call us on the following telephone number:
+34 638 373 90 71
Aviso Legal | Privacy Policy | © Copyright 2021 Colliers International Spain S.L.